JIT Purchasing

Purchase JIT scheduling system is the procurement of goods in a way such that it can be done immediately to meet demand delivery or use.
Purchase JIT can reduce time and costs associated with purchasing activities by:

1. Reducing the number of suppliers so that companies can reduce the resources expended in negotiations with pamasoknya.
2. Reducing or eliminating the time and cost negotiations with suppliers.
3. Having a buyer or customer with an established purchasing program.
4. Eliminate or reduce activities and costs that are not value added.
5. Reduce time and cost for quality inspection programs.

Understanding the JIT

In broad terms, JIT is a philosophy that focuses on timely activities required by other internal segments within an organization.
JIT has four main aspects as follows:

1. All the activities are not value-added to the product or service should be eliminated. Value-added activities that do not unnecessarily increase the cost of such supplies as much as possible to zero.
2. Commitment to constantly improve the quality higher. So that the damaged and defective products as far as possible to zero, does not require the time and cost to rework defective products, and buyer satisfaction can be increased.
3. Always strived continuous improvement (Continuous Improvement) in improving the efficiency of activities.
4. Emphasis on streamlining the activities and improve the understanding of the value-added activities.


Learn More about 5s Management & Lean Manufacturing

Senin, 15 Agustus 2011

Kanban systems for JIT

In Japanese manufacturing systems of the kanban system is a very popular term in the adjustment process and maintain the production of Just-In-Time. Kanban system is an information system that harmoniously controlling the production of products needed in the required amount at the time it takes in every process plant and also between companies. This is known as the timely production (Just-In-Time = JIT). At Toyota kanban system is seen as a sub system of the Toyota production system as a whole. In other words, the kanban system is not the same as the Toyota production system, although many people mistakenly refer to this latter kanban system.


Learn More about 5s Management & Lean Manufacturing

Sabtu, 13 Agustus 2011

Six Sigma as a tool and system management

In the study of Six Sigma, there are several qualifications that are often referred to as a White Belt, Yellow Belt, Green Belt, Black Belt and Master Black Belt. Each has its own level of expertise required, simply getting into the direction of Master Black Belt, of course, requires more skill and experience are more complex.

Six Sigma is not just quality improvement, but it could become an integrated management system that has an impact on various aspects, including the discipline of leadership development. That said, a qualified operator should-he was a white-yellow belt or a belt, a team leader or supervisor ideally a green belt that is capable of organizing improvement team, preferably in a managerial level it is a black belt in charge of organizing the improvement team and set a performance improvement program in the area of responsibility. When we refer to the level of Master Black Belt, this capability must be owned by a business unit head is capable of delivering a large impact on the achievement of change management six sigma performance.